This page provides you with the real and most updated / latest Certification Question with Correct Answers for the SAP S/4HANA Production Planning and Manufacturing (C_TS422_1909 / C_TS422_2021). We at ERPKITE providing these questions for free to all the SAP certification candidate to showcase the quality of the question prepared by our SAP subject experts.

 

We have developed an advanced methodology to prepare for the SAP S/4HANA Production Planning and Manufacturing (C_TS422_1909 / C_TS422_2021) exam to make it easy for anyone to pass the SAP C_TS422_1909 / C_TS422_2021 certification and be certified on the SAP S/4HANA Production Planning and Manufacturing. The methodology is practice to learn, as the memory principle and many deep research suggest, the practice could lead to a very long-lasting memory.

 

Highly Recommended Practice test: SAP S/4HANA Production Planning and Manufacturing PRACTICE TEST
Complete Syllabus: SAP C_TS422_1909 / C_TS422_2021 Syllabus

 

SAP S/4HANA Production Planning and Manufacturing (C_TS422_1909 / C_TS422_2021) Free Sample Questions

QUESTIONS

01. What generates capacity requirements in a process order?

Please choose the correct answer.

a) Activities
b) Phases
c) Operations
d) Resources

 

02. You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?

Please choose the correct answer.

a) Top of Green
b) Top of Red
c) Top of Yellow
d) Top of Red Base

 

03. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?

There are 2 correct answers to this question.

a) Storage location data
b) Warehouse number data

c) MRP area data
d) Production version data

 

04. A material in your company is planned with planning strategy 70 (Planning at assembly level).
The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards?

Please choose the correct answer.

a) From the planned independent requirement date of the material
b) From the requested delivery date of the related finished good
c) From the availability date of the related finished good
d) From the dependent requirement date of the material

 

05. Which of the following elements does the MRP run take into account?

There are 2 correct answers to this question.

a) Sales orders
b) Planned independent requirements

c) Shipments
d) Material documents

 

06. You are creating a production order manually. What activities are involved in this process?

There are 3 correct answers to this question.

a) Planning selection
b) Master data selection
c) Capacity requirements determination
d) Order type determination

e) Actual cost calculation

07. What are the three layers in the SAP Best Practices Content for SAP S/4HANA?

There are 3 correct answers to this question.

a) Solution Package
b) Scope Items
c) Building Blocks

d) Test Scripts
e) Process Flows

 

08. Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available?

There are 2 correct answers to this question.

a) Resource overview
b) Resource utilization
c) Order list

d) Production list

09. To trigger a goods receipt posting, which Kanban status do you have to set?

Please choose the correct answer.

a) In use
b) Wait
c) Empty
d) Full

 

10. Which transaction code can you use in SAP S/4HANA to enter and display goods movements?

Please choose the correct answer.

a) MB02
b) MBNL
c) MIGO
d) MMBE

 